Campus Construction Projects

Campus Construction Projects

Just like Greater 得梅因, 威尼斯人网上娱乐 is improving more 和更多的 every year. We're changing our spaces to make them more accessible, make learning more interactive, and add elements of fun to campus. We are also focused on including our community and making sustainable choices. Take a look at what is being worked on, what has been finished, and what is to come.

快速链接:

进行中项目

接下来是什么

完成项目

 

 

进行中项目

Morehouse Revitalization

项目描述: The renovation of the historic Morehouse Residence Hall into a dynamic Student Center will provide a home base for 威尼斯人网上娱乐’s 150 student-led organizations. This will be the place w在这里 students discover what it means to contribute to something larger than themselves. Built on the values of community and inclusion, the Student Center in Morehouse will be a place w在这里 everyone is welcomed and encouraged to find joy in their best selves.

项目位置: 豪斯厅

项目状态: 在进行中
Projected Completion Date: 2025年春季

更多信息:

更多的信息 在这里.


接下来是什么

融合发展

项目描述: Redevelopment of a city block in Dogtown. New residential units, 商业空间, 还有办公空间. Four and five story construction.

This includes the new Toppling Goliath taproom.

得梅因 Film Society has restored The Varsity Theater (learn more below).

项目位置: Between 24th and 25日,圣.大学大道. 及卡彭特大道.

项目状态: 计划
Projected Completion Date: 2025年秋季

更多信息:

2019年6月24日2021年12月21日

Mixed-use development project is led by the Merge Urban 发展 Group.

Varsity Cinema project is led by the 得梅因 Film Society.

更多的信息 on Toppling Goliath 在这里.


完成项目

梅瑞迪斯大厅 Revitalization

项目描述: Creating a student-focused, 技术-rich learning environment, including a flexible digital media production studio and new collaboration spaces.

项目位置: 梅瑞迪斯大厅

项目状态: 完成
Projected Completion Date: 完整的

更多信息:

更多的信息 can be found at 

Meredith Revitalization 2022-2023

慷慨陈词体育场

项目描述: 得梅因 Public Schools newest home field, serving the needs of high school and middle school football and soccer. An on-campus home for the NCAA Division I, 威尼斯人网上娱乐 Bulldogs men’s and women’s soccer programs.

项目位置: East of the Knapp Center, 24th St. 和森林大道.

项目状态: 完成
Projected Completion Date: 2023年秋季

更多信息:

For more information, click 在这里.

 

Broadlawns Community Clinic at 威尼斯人网上娱乐

项目描述: Broadlawns Medical Center will construct a 12,000 sq. ft. clinic, open to the general public and accessible to 威尼斯人网上娱乐 students and employees. The project is intended to help solve two issues: fill a gap in primary care providers in the community and expand 威尼斯人网上娱乐’s student health services.. Services available at the clinic will include family medicine, 紧急护理, 心理健康, and a rotation of specialties. The Broadlawns Community Clinic at 威尼斯人网上娱乐 represents a $12 million investment in the neighborhood.

项目位置: 29日圣. 和大学大道.

项目状态: 完成
Projected Completion Date: 2023年9月

更多信息:

有关详细信息,请单击 在这里.

2023

梅瑞迪斯大厅 Revitalization

Photograph of 梅瑞迪斯大厅

In coordination with the State Historic Preservation Office, the renovations include improvements to the HVAC system, 照明, 天花板, 外部画, 技术, 礼堂的座位.

更多的信息 can be found at Meredith Revitalization 2022-2023.

 

Broadlawns Community Clinic at 威尼斯人网上娱乐

Members of the community and 威尼斯人网上娱乐 students, 教师, and staff now have a convenient location to receive primary care, 紧急护理, 心理健康 services, and access to a rotation of specialty services.  

 

慷慨陈词体育场

In partnership with 得梅因 Public Schools, this stadium is the home field for the DMPS football and soccer teams as well as 威尼斯人网上娱乐's men's and women's soccer teams.

 

 

2022

融合发展

Redevelopment of a city block in Dogtown which includes new residential units, 商业空间, 还有办公空间.

2021

Canary Lofts by 尼尔森施工 & 发展 26th Street 和大学大道nue

尼尔森施工 & 开发项目

135 new residential units, 6,000-square-feet of 商业空间. Four story mixed-use, mixed-income development. 代表20元.6 million investment in the neighborhood.

 

The Tom and Ruth Harkin Center 28th Street 和大学大道nue

 

首页 of the Harkin Institute for Public Policy & 公民参与. 16,000-square-feet, $8.7500万年. A model of universal design.

 

威尼斯人网上娱乐 体育运动 Marquee Sign 27th Street 和森林大道nue

A new, fully digital marquee sign celeb评级 威尼斯人网上娱乐 student athletes. 

 

Sprout Learning Garden Carpenter Avenue and 30th Street.

The Sprout Garden is now relocated from its previous 森林大街nue location to the grassy area west of campus on 30th Street, just south of 威尼斯人网上娱乐 West Village. The new space will allow the garden to expand its growing capacity and educational opportunities through the addition of native plants, 树, 和卫生. 

2020

哈贝尔餐厅 

 

Remodel of Hubbell Dining hall kitchen and Quad Creek spaces, refreshing of the kitchen space, 服务站点, 用餐体验. In partnership with our food service partner Sodexo, we embarked on a multi-million-dollar renovation of 哈贝尔餐厅. The new design provides more diverse meal stations and options. 

 

首页2 Suites by Hilton 26th Street 和大学大道nue

86,000-square-feet, including 11,000-square-feet of ground floor 商业空间. 124 room extended stay hotel. Representing a $28 million investment in the neighborhood.

 

斗牛犬广场 大学大街nue in front of Old Main

斗牛犬广场

Featuring a bronze bulldog statue in the likeness of 威尼斯人网上娱乐’s live mascot, 女孩, the bulldog statue is positioned in a way to create a unique photo opportunity for visitors and the campus community with Old Main in the background. This project is made possible by a generous donation from Bob and Pam Lees on behalf of three generations of 威尼斯人网上娱乐 alumni that includes Robert R. Lees (LA'50, GR'55), Robert H. Lees (LA'74), Christina A. Lees (Gause) (BN'98), and Brian D. 李99年(BN). 

 

大学大街nue Streetscape Improvements 大学大街nue from 25日,圣reet to 31st Street. 

大学大街. 街景画的概念

Initiated by the City of 得梅因 sewer separation project and implementing the 2007 conceptual plan (revised)大学大道nue streetscape updates improve pedestrian safety, 公共交通节点, and to integrate the campus, neighborhood and Dogtown business district.

2019

Restrooms改造 霍华德•霍尔

霍华德•霍尔 

Two new gender inclusive restrooms were added to the main floor of 霍华德•霍尔.

 

Gregory and Suzie Glazer Burt Boys and Girls Club 25日,圣. & 森林大街.

Second Boys and Girls Club on the campus of a private university. Partnership with Boys and Girls Clubs of Central Iowa.

阅读更多

 

奥姆斯特德星巴克 Olmsted Student Center

Fully-licensed Starbucks franchise and new study space that replaced the Olmsted Coffeeshop.

 

Roger Knapp Tennis Center is Net-Zero

过去一年里, every light in the tennis center and parking lot were changed to LED, which also included replacing the court lights with a more efficient fixture using 75% less energy and providing twice as much illumination ensuring the courts meet NCAA standards for competitions. In summer 2019, 346 solar panels were installed that produces 165,900 kWHours a year. With the reduction of electricity use from 照明 upgrades, the project engineer determined that 346 solar panels were sufficient to produce enough electricity through renewable energy that would equal the amount used in the building for the entire year making it a “net zero” building.

阅读更多 about 威尼斯人网上娱乐’s sustainability initiatives

View real-time information

 

2018

Collier-Scripps Hall and Ray Center

观赏风景, 55,000 square foot academic building that houses STEM@DRAKE, including the 教育学院, math and computer science classes, Instructional Material Center and new Robert D. 和比利雷中心. Equipped with wireless display screens and windows lining the walls, the classrooms have a modern and cutting-edge feel. This building, along with the Science Connector Building, received a 两个绿球 评级.

 

考尔斯库 study spaces Main floor of 考尔斯库

New, modern furniture that makes studying and collabo评级 easier.

 

Quad Residence Halls HVAC update Carpenter, Crawford, Herriott and Stalnaker

Brand-new ventilation equipment installed in four first-year residence halls.

 

Robert Ray Promenade 前27街

The Promenade adds more green space to the heart of campus and serves multiple purposes, such as a meeting location, 研究发现, 表演场地, 野餐的目的地, 和更多的.

 

Science Connector Building

The Science Connector Building has state-of-the-art laboratories and classrooms and is the crucial link in an interconnected complex that includes Olin, 惠誉, 摩根E. Cline, and Harvey-Ingham halls. The new building offers flexible classroom spaces that can be configured to accommodate a variety of teaching styles and student needs, as well as collaboration spaces with adjustable seating, 大白板, 和技术. This building, along with Collier-Scripps Hall, received a 两个绿球 评级.

总是有新的东西

吊床结构 outside Goodwin-Kirk Hall and Herriott Hall

The Office of the President installed two hammock structures that provide a fun, new way to enjoy the outdoors.

 

Knapp Center floor and LED 照明

新木地板, detailing and LED overhead lights installed to be used for 威尼斯人网上娱乐 Men’s and Women’s Basketball.

 

景观家具 Olin Hall patio, Cowles, Olmsted

Donated Adirondack chairs that create impromptu study and meeting spaces outside.

Moveable umbrellas on picnic tables with USB plug-ins to make working outside easier.

 

灯杆横幅

Spreading Bulldog pride across campus with fun memories and quotes.

 

奥姆斯特德贴花 Olmsted Student Center exterior

Olmsted is often one of the first buildings newcomers will see or enter. These new decals show them what 威尼斯人网上娱乐 is all about and make it pop from across campus.

 

The Road to 2020 Starts Here 梅瑞迪斯大厅 south exterior

Iowa is the first state in the country to hold its caucuses. 威尼斯人网上娱乐 is lucky to be in the epicenter of the nation’s politics and welcomes numerous candidates during every political cycle.

 

沙排球场 Goodwin-Kirk Courtyard

Regulation sand volleyball court that can be used for tournaments or just for fun. This project was a collaboration between the 学生参议院, Residence Hall Association and the University.